I am writing to commend you and Foss Demolition for your team’s performance as CDI’s main demolition subcontractor for the removal of the 880 MW FPL Lauderdale Plant located in Dania Beach, Florida.

Project Overview:

Your scope of work called for the demolition of two (2), 2 x 1 combined cycle units, two (2) steam turbines remaining from a prior re-powering effort by FPL and all related administration, switchyard and water treatment facilities.

Your scope included foundation removal, segregation, characterization, and removal of all demolished materials, as well as crushing/stockpiling of 80,000 tons of concrete on site for FPL’s use in construction of their new, 2 x 1 combined cycle 1,200 MW facility.

Foss’s Performance:

After mobilizing a substantial, well supervised crew and heavy equipment to the site, you worked 60,000 man-hours over a 12-month period without a single first aid case, much less a recordable lost time incident. Despite the addition of several add-change orders to your scope, you finished phased work on site early, permitting FPL to begin new construction efforts two (2) months ahead of schedule.

By the end of the project, you had demolished and recycled over 19,000 tons of steel and 2,000,000 pounds of non-ferrous metals.

We would not hesitate to use Foss as a subcontractor on future projects.